CoolShirt Universal Connector Drain Kit

CoolShirt
2 reviews Write a Review

$75.00

SKU:
5006-0001
Internal ID:
602182
bisibi_enabled:
F
stock_status:
Out of Stock
clearance:
false
firearm:
false
exclude_free_shipping:
false
SKU: 5006-0001

Details

Universal Connection Drain Kit

Kit includes 8 pieces (four 5/16 female fittings, four 5/16 male fittings and one 6-pack of O-rings)

To install any new connectors on the COOLSHIRT, COOLVEST, Disposable COOLVEST or insulated hose, follow the steps below that apply:
  1. Remove your existing male connectors from your COOLSHIRT, COOLVEST or Disposable COOLVEST by simply cutting them off from the tubing just behind the connectors.
  2. Install the male large barb connectors to the remaining tubing by stretching the tubing open slightly with a pair of needle nose pliers; dip the barbed end of the new maile connectors into some soapy water to lubricate them and insert the barbed ends into the clear tubing until fully seated against the connector
  3. Remove your existing female connectors from the end of your Insulated Hose (female connectors have the release push-buttons ) by simultaneously cutting the insulation and internal black tubing just behind the connectors.
  4. Install the male & female small barb connectors to the black internal tubing by stretching the tubing open slightly with a pair of needle nose pliers, dip the barbed end of the new female connectors into some soapy water to lubricate them and insert the barbed ends into the black tubing until fully seated against the connector.
  5. Check O-rings for cracks and signs of wear. Replace as needed.
To use the UK-8 Drain Kit to drain any COOLSHIRT, COOLVEST, Disposable COOLVEST or insulated hose, follow the steps below:
  1. Hang the COOLSHIRT, COOLVEST, Aqua Vest, or Disposable COOLVEST in an area where the water can freely drain.
  2. Attach both of the C-FLM Female connectors to the male connectors from your COOLSHIRT, COOLVEST, Aqua Vest, or Disposable COOLVEST by simply inserting the male connector into the female connector until you hear an audible click. The cooling garment will begin to drain immediately.
  3. With the insulated hose attached to the cooling system, connect the C-MLS to the flow side of the insulated hose by inserting the male connector into the female connector of the insulated hose until you hear an audible click.
  4. Place the open end of the hose in to a drain area. Turn on the pump to the cooling system to pump all the water out of the cooling system through the C-MLS and into the drain area.

2 Reviews Hide Reviews Show Reviews

  • 3
    work ok.

    Posted by Verified Buyer on Jan 17th 2014

    I got a pack for Christmas as a gift. I had two of them that do not work very well but the others work great and for the price I can't really complain.

  • 2
    Alittle bit more money is sometimes good

    Posted by Verified Buyer on Feb 11th 2012

    The package deal was good but only 4 out of the 6 worked. maybe poor design or manufacturing. I might think about issueing my EMT,s and Paramedics mini mag lights. They are always dependable.